DRAFT PENANG STRUCTURE PLAN 2040 (Review)

Protection and reclamation. A planning question.

The supplied draft-plan extract places the Middle Bank Marine Sanctuary among high-impact projects, while also mapping proposed reclamation at the same location. Read both designations together.

Supplied Pelan 6.1 location detail with an overview inset and enlarged Penang Strait map, showing blue project marker 2 near Jelutong and Glugor and pink areas with blue diagonal hatching.View the map in detail
Location detail adapted from Pelan 6.1, Draft Penang Structure Plan 2040 (Review) / PLANMalaysia. The overview inset and enlarged strait map are shown in full; the title, project list and legend are in the separate extract linked below.
Read the full extract, project list and legendDownload the supplied location map
Pale-blue planning-map swatch with grey diagonal lines for the proposed Middle Bank Marine Sanctuary.

Proposed Middle Bank Marine Sanctuary

The pale-blue area with grey diagonal lines identifies the proposed Middle Bank Marine Sanctuary on the supplied planning map. It is a proposed designation, not proof of gazettement.

The sanctuary appears as High-impact Project 2.

The blue number 2 identifies “Middle Bank Marine Sanctuary” as High-impact Project 2, one of 14 high-impact projects proposed in the draft plan. It is a planning designation, not proof that a sanctuary has been gazetted.

On the supplied map, this sanctuary designation overlaps the pink area with blue diagonal hatching used for proposed reclamation. The map shows overlapping designations; it does not establish a surveyed overlap area or project approval.

Proposed reclamation areas agreed to by the State Government

Kawasan Cadangan Tebus Guna Tanah Yang Telah Dipersetujui oleh Kerajaan Negeri

The legend reads “Kawasan Cadangan Tebus Guna Tanah Yang Telah Dipersetujui oleh Kerajaan Negeri”: proposed reclamation areas agreed to by the State Government. This describes the map designation; it does not explain the terms or status of individual project approvals.

The community points to a contradiction.

Pink areas with blue diagonal hatching mark proposed reclamation. The Protect Karpal Singh Drive Action Committee argues that placing this designation at Middle Bank conflicts with the sanctuary proposal. That is the committee’s attributed position; the extract alone does not establish illegality.

Pelan 6.1 is a map label, not a numbered clause. This extract does not establish completed gazettement, a precise overlap area, project-specific ecological impacts or legality. Those questions require the full documents and relevant legal instruments.

Ask for a clear, documented answer.

PROPOSED CONSERVATION AREA

A proposal is not a gazette.

The reviewed sources describe a proposed Middle Bank Marine Sanctuary. A November 2025 official state statement reported impediments to gazettement. No completed legal instrument has been verified for this edition.

Source check: 14 October 2026 · gazettement statement cited: 19 November 2025

Read the source

Conservation

A documented chronology

Select an event to read its context and source. These records do not constitute a complete legal or project history.

An extension of time, an EIA decision, an adopted structure plan and sanctuary gazettement are separate records. Read each dated account within its scope.

2021

Institutional studies commissioned

+

The 2023 monograph describes a state mandate to CEMACS and Penang Institute to prepare the groundwork for a sanctuary.

Source
2021–22

Ecological baseline surveyed

+

Field surveys from October 2021 to March 2022 informed the published baseline.

Source
2023

Baseline report published

+

The monograph brought ecological mapping and species information into a publicly available institutional report.

Source
2025

State position on gazettement

+

An official November statement described administrative, legal and interagency obstacles to gazettement.

Source

Public-display deadline passes

+

PLANMalaysia’s notice sets the draft-plan publicity and public participation period at 10 August–9 September 2026. That period has closed. The notice alone does not establish adoption of the plan, permission for a project or sanctuary gazettement. Residents can seek documented clarification on how earlier feedback was considered and what happens next.

Source
10 September 2026

Community challenges the draft-plan contradiction

+

The Protect Karpal Singh Drive Action Committee argues that the sanctuary proposal is contradicted by proposed reclamation at Middle Bank. The supplied Pelan 6.1 extract lists the sanctuary as blue High-impact Project 2 and shows the pink-and-blue reclamation designation at the same mapped location. This attributed concern does not establish a precise overlap area or illegality.

Source

What meaningful protection needs to answer

01How will the sanctuary and proposed reclamation designations in Pelan 6.1 be reconciled, and which boundaries and legal instruments apply?

02What instrument establishes protection, and when does it take effect?

03Which surveyed habitats and ecological connections are included?

04Who is responsible for monitoring, enforcement and public reporting?

05How will cumulative pressures and community access be evaluated?

Keep the evidence categories visible.

A documented pressure, a plausible ecological mechanism and a demonstrated project-specific effect are different claims. Project status and consultation channels should be checked against current original documents.